Monday, June 16, 2014


 The lumber for the gate on the fishing pier was delivered on Friday. Work is set to begin tomorrow.
 The gates were fitted today and electrical infrastructure installed. The gates will be sent to San Antonio for galvanizing. Final installation should be completed in the next two weeks.
The welder attached a leg and wheel to follow the track on the concrete. At the other end a wheel was installed that will roll on the track over the grass.