Tuesday, April 11, 2017

Weekly notes from Lina.

- Painted upper deck railings 601, 602, 603, 604, 606, 607 and lower railings of 602 & 607
- Planted new plants under the electrical panel on the 200 building, gardenias on 107/108 front porch area, and in pot in pool area
- Monitored the pool depth markers and pool tiles being repaired by Area Foundation - they pressure washed the concrete deck area but recommends to re-stain it to give it a cleaner look
- Monitored the breakwater contractors pulling up the shore guard left under water
- B&R Electric replaced the photo cell on the 100 building
- Removed the weeds from the palm tree area near front gate area
- Interviewed several candidates for maintenance and security positions
- Tested irrigation controllers for batteries needed and controllers needing replacement
- Monitored the new motor install at pool pump by Allen Pools
- Caulked sliding door and window on back deck of 405
- Called several welders for service needed on exit gate bracket


This weeks agenda
- Pressure wash porch areas of 300 and 500 building
- Scrape and paint skirting areas under electrical panels and front walkways of 300 and 200 building
- Repair ac lattice that is coming apart near 708
- Follow up on welder for exit gate bracket
- Touch up paint on pool fence and gate areas
- Spray weed kill near rock bed area near the 2 dumpsters facing the 400 building
- Plant flowers in the bed area under the palms at front gate entrance area