Work on the crossbridge continues. The new posts are installed. Shoreguard was added at the end near 608. A large pile of debris remains. The posts that I thought could be reused are all gone. I guess someone will use them. There were probably $2000 worth that could have been reused, perhaps in other projects. The new bridge is progressing from the boat ramp area. The new bridge is two feet higher. Instead of using steps to transition from the sidewalk area, a long ramp leads up to the higher lever. So far it looks really good.