Tuesday, August 17, 2010

Work began today on tearing out the ramp to the old pier and part of the pier too.This area and the area in the picture below will be filled with a concrete apron to join the concrete in the picnic area.Fabric was placed in the areas of the bulkhead that were separated and allowing water and sand to flow back into the bay.

Sand was rearranged on the beach to fill the washed out area next to the bulkhead. Sand was pulled from next to the skirting and moved nearer the water. This is saving the cost of buying more new sand.