Friday, September 30, 2011


While Larry Skelton finishes up the bayside deck rail painting, Larry Rabe has started work on the AC enclosures. The rotten wood is being removed or replaced and the lattice work is being reinforced with 1x2 boards. Notice the zip ties that are holding together a lot of the enclosures at this point.

0 Comments:

Post a Comment

<< Home