Thursday, November 10, 2011

While Jack was here he used his excavator to dig out the area where our boatwash drain is located. It was so silted in the drain exit was below the ground level and the water backed up on to our concrete drive area. He also cleaned out the area in front of the drain pipes that lead from the HEB property. This will allow water to flow again between the two areas. This has been blocked for years. He then cleared a channel behind the maintenance shed to allow water to drain back into the mitigation site and not stagnate behind the shed. These were all needed maintenance issues and he did them at no extra charge over his bid to repair the bulkhead.
This greater egret enjoyed the restored water flow. Small fish moved in to feed on the disturbed organisms and the egret fed on them.
There were washouts under previous repairs as well as two areas of bulkhead that needed repair. Even though this was not in his bid either, he repaired them at no additional charge.