Wednesday, January 30, 2013



A concrete pad was poured at the south end of the boat parking to accommodate a dumpster. Last year the extra dumpster was placed on the sidewalk for the short term. A wood fence will be added to enclose the dumpster.

0 Comments:

Post a Comment

<< Home