Thursday, June 06, 2013


Jack Gibbs had a crew here this week to trench from the electrical panel at the pool to the light poles at the tennis court. They decided to hand trench since there were so many buried water lines and electrical lines in the area. While the trench was open JR laid in some sprinkler wiring that he had in his garage that allowed us to replace two of the battery powered irrigation controllers with the master 24 volt system. The older wiring had not been used because the wires leading in had been broken for years and the location of the break was unknown.

0 Comments:

Post a Comment

<< Home