Saturday, April 12, 2014

 Work continues on improving the parking area near the pier. This spillway will drain away the water that splashes over the bulkhead and tends to flood and washout the parking area.
The exit gate and fence will cross the road at this point and attach to the 700 building at the end of the AC enclosure. The sidewalk will be extended for the walk through gate at this point in the fence.
The fence will extend all the way to the bay across the existing bulkhead.  The shovel in the picture marks the location of an underground conduit for connecting the electrical wiring for the gate motor.

0 Comments:

Post a Comment

<< Home