Thirty feet of new bulkhead were poured last Monday at a cost of nearly $8,000.
Before the concrete could set up, some of it started to leak through to the bay.
By Friday everything seemed to be set up and totally repaired. Then when the tide came up on Saturday, the high tide started to wash out some of our real estate again. This was not part of the new bulkhead, but it was said to have been repaired because we were having washouts in this area. Back to the drawing board. More money!
At the top of the this picture you can see shell being washed up and over the new part of the bulkhead. Our new 30 feet of bulkhead is now down to about 8 feet to go until we need to add some more.