Monday, May 04, 2009



These pictures show the need for additional sand to fill the area along the entrance road. The dropoff from the new concrete is at least eight inches in most places and a lot of fill would help. Along the bulkhead of the mitigation site there is some washout. We have about ten yards of sand from the concrete work piled in front of 508 right now. Likely tomorrow, a dump truck will show up to haul the sand away. I don't see why we can't save the trouble and cost later to just use the bobcat to place this sand where we need it now.