Work began today on the repair of the area at the start of the old pier. Rock will be placed from the bulkhead to the end of the fabric underlayment in the this picture. Concrete will be placed from the end of the fabric to the area near the barbecue pit in the picture.
I had thought the concrete would cover this whole area. The washout always occurs where the bulkhead meets the channel wall. It will be interesting to see if the rock holds up to the next high tide. I'm not sure how the leaning channel wall will be repaired or strengthened.
I had thought the concrete would cover this whole area. The washout always occurs where the bulkhead meets the channel wall. It will be interesting to see if the rock holds up to the next high tide. I'm not sure how the leaning channel wall will be repaired or strengthened.
0 Comments:
Post a Comment
<< Home