Tuesday, February 08, 2011


On Sunday, the storage building in front of Phase II was moved off the property. The building belonged to the previous owners of the onsite rental operation.

Larry Rabe has begun to replace the rotted window trim. He is moving at a clip that should complete the project in no time, weather permitting.
Even though the mitigation site partially froze over, there was not a major fish kill from the freeze. We did have a lot of frozen pipes. Even though the faucets were set to drip, some of the pipes under the buildings froze because the water was not moving there. Under 507, the supply lines to both a toilet and the kitchen sink had to be repaired.