Tuesday, October 08, 2013


 The painting of the back of the 100 building started last week. The new hardiplank has blended in well and it looks as if the painting will be wrapped up by tomorrow. Every vertical column was redone with hardiplank from top to bottom.
More repair needs to be done to this wall on the outside deck of 209. A small piece was bad at the bottom, but when the work started to repair it, they found the whole wall was rotted and needs to be replaced. This will be done with stucco to match all the other walls on the 200 building. Hardiplank was used on the 100 building because so much of it had to be redone and the hardiplank is a better long term repair.