Friday, November 01, 2013


 We just replaced the concrete in front of the crossbridge about three years ago. Now it has sunken again and dropped below the level of the right side of the bridge. It was considered to replace the concrete again.
Jerry did some tricky cutting on a 4x4 and came up with this wedge design to provide a gentle ramp up to the bridge. Looks good and works well. Jerry is pretty good at problem solving.

0 Comments:

Post a Comment

<< Home