Wednesday, February 26, 2014

The bulkhead repairs are moving right along. The concrete cap is considerably larger than we anticipated, but to incorporate the shoreguard and posts into the cap, the size had to be increased. The was no upcharge for the additional concrete.
 Jerry has installed four pet waste stations that Nancy(604) said she would fund for us. Now if we can just get folks to use them consistently. Thank you Nancy.
Jerry saved us an electrician charge when he was able to do a great job of installing this additional lighting on the cabana to light the area between the pool and the sidewalk. The light will be on a dusk to dawn light sensor.

Just when things were going along well. one of the pumps in the lift station shut down on last Friday. PEECO has pulled the pump out to take it to their shop to see what the problem is. This pump had been going since 2001. I hope it isn't history since a new one goes for about $10,000.
Also today the power went off on all the buildings except the 100 and 700. JR believed it may be a problem with our transformer by the dumpsters by the 400 building.