 Work is almost complete on the gate across the crossbridge. The top of the gate will be trimmed into a semicircle. There will be a lock installed to prevent access from the west side without the proper code.
The concrete bulkhead behind 103 has split apart. Demo work is being done now in order to pour a new concrete cap.