 Jerry used the low tide time on Friday and Saturday to try to fix the washout under the bulkhead. It's hard to see, but the seams don't match as the extra shoreguard that JR gave us is a different style. Jerry had to cut the piece vertically and drive the extra pieces into place. He then put a lot of concrete in the washout to seal the leaks. When this wall was built, we didn't anticipate the HEB side to erode below the level of the bottom of the shoreguard. It looks as if there may be some additional areas that may need the same fix.