Lina's weekly notes
- Removed extra track from exit gate and installed on entrance gate
- Removed extra track from exit gate and installed on entrance gate
- Moved several pieces of shoreguard to under 100 building in lieu of 700 building because foundation contractors are working there
- Foundation contractors are under 700 building removing rotten posts
- Monitored the breakwater contractors - they came out on Tuesday 9 to 10,Wednesday 12 to (saw at 330) 5 (?)
- Removed weeds from the 200 building bayside and back of 700 building
- Pressure washed the lower back decks 701, 702, 703,704 and upper decks of 710 of 700 building - then my pressure washer hose busted
- Repaired irrigation sprinkler near entrance gate
- Hosed down front porch areas of bugs on the 100 and half of 200
- Repaired hinge on pool pump area
- Scheduled meeting with Attorney Bryan Stone on April 27 at 10:30am
- Uprooted hibiscus on the side of 701 and planted new bushes
- Painted ceiling of 201 for water marks
- Ordered the 9 volt batteries for the irrigation and smoke alarms
- Painted the gazebo posts near the 300 building
This weeks agenda and weeks forward
April 24th - Caulk above porches and corner areas 500, 600, & 700 building
Email policy parts that are completed
Pressure wash other half front porch areas from bugs of 200, 300
Meet with Bryan Stone - Attorney April 27th at 10:30am
Order Schedule 80 posts from Fergusons to replace crossbridge poles
Trim bushes as needed
Install all-thread in west finger piers to give extra support - need to reevaluate
Install extra support beams on 2 finger piers behind the 400 building
Order irrigation controllers
Monitor the start of the pier turn-out project by Area Foundation
May 1st - Send out newsletter to owners
3G Contracting Stucco project will begin behind the 200 building
Caulk above porches and corner areas 100, 200, 300, 400 building
Improve landscaping on entryways to condos
Pressure wash on back decks and under upper deck - 500 building - Need to see if we can
get other pressure washer going
Touch up paint on entrance and exit gate area
Pull sand away from skirting behind 100 building change out rotten skirting on the bayside
May 8th - Replace 2 -3 crossbridge poles with Mike Rodriguez - Electrician
Touch up paint on pool fence area
Pull sand away from skirting behind 100 building change out rotten skirting on the bayside
Touch up paint on gazebo posts near pool area
May 15th - Purchase another BBQ from HEB
Order 4th garbage bin for property to be dropped off for the week of
0 Comments: