Friday, March 31, 2017

Lina's weekly notes.

- Assisted with Pest Control on finishing the quarterly spray on the 300, 200, 100, and 700 building

- Removed trash from the mitigation area

- Requested for Randy Edwards to remove his boat and trailer from the property and to repair and put our floating dock that we had lent out for the breakwater project back to where it was. 

- Removed weeds from the 500 and 400 building

- Painted the skirting in between 500 and 600 building that had orange discoloration.

- Painted 603 and 604 lower deck back railings

- Reinforced pier light that had fallen and checked  for loose deck boards on pier and crossbridge and invoiced Phase II accordingly for their shared cost.

- Changed out sprinkler near the tennis court area

- Put one bracket on entrance gate chain to help absorb the force from the pull of gate

- Removed 8 inches of chain slack on entrance gate

- Spread more ant kill on the ant piles in the pool area and picnic areas

- Picked up and installed starter generator on golf cart - had to fix wiring as all the wires were cut

- Modified sand drag by removing some teeth on both sides

- Submitted an ad on Craigslist and Rockport pilot for maintenance and security help

This weeks agenda
- Schedule interviews for job positions
- Paint railings 605 and 606
- Remove weeds from the 300, 200, and 100 building area
- Send a letter out to Randy Edwards regarding 3 rd request to remove boat and trailer from the property
- Monitor the concrete pour under the 200 building by Area Foundation on Friday
- Follow up with 3G regarding the stucco project on the 200 building regarding a bid for window installation while in doing construction.  
- Monitor the cutting of the palm trees
- Change out the entrance gate, walk-through gate, and crossbridge gate codes for April 1.
- Meet with Smith Jester of Smart Docks regarding a bid for removing the remaining shoreguard left under water by Randy Edwards