Monday, June 16, 2008



The roofing work continues. The front of the 700 building still has tile to be removed, the back side is progressing. The top photo shows the new roofing being raised by conveyor to the rooftop. The bottom shows the work being done to install the new shingles. The contractor tells me he will be through soon. He said he was delayed because Chris decided to use 40 year shingles after 30 year shingles had been ordered and the new shingles arrived a week later than had been planned. There is so much going on its hard to tell which workers are working for whom. The smaller out buildings still have to be completed as well as the bay window roofs and the electrical box roofs. I feel we should tear down the old pump house rather than reroof it. The owners voted seven years ago to tear it down, but it never happened. It serves no useful purpose and is leaning as if it will fall soon anyway. The last decks on the 700 building have not been replaced. They will probably be painted anyway and replaced later this summer. I suggested to Justin that if Rob is too busy now, it could be done by someone else and not have to be done later at an extra painting expense. Justin said he wants to have everything finished up by July 4th.

0 Comments:

Post a Comment

<< Home