Sunday, February 15, 2009


More of the crossbridge posts failed last week. Rob used John's pontoon boat as Rob and Tony worked to replace some of the posts and repair the bridge. Nearly all the old posts are rotted completely in two. The whole bridge will be replaced soon.
I saw on TV last week that Charter Communications has filed for Chapter 11 reorganization. I have no idea how that may impact us.
The motel had a major sewer problem late last evening. John and Scott came out to work on it. I came inside at 2 a.m. and they were still working on cleaning up some of the rooms.
John(guest in 103) caught a 14 1/2 inch flounder off the bulkhead Friday morning. That was the only keeper that I am aware of that was caught this weekend. Kevin(501) took Cyrena out to Long Reef on Saturday morning in the fog. (He said it was for Valentine's Day.) They had just arrived when a front moved through and they had a rough ride back and not a fish to show. At least with the higher tide they were able to get out of our channel.

0 Comments:

Post a Comment

<< Home