Tuesday, June 02, 2009


Work began today on rebuilding the Phase II pier. This picture shows just part of the lumber and materials that will be needed. Square posts are going to be used. This should make for a stronger construction. The pier will be five feet above the average water level. The end will be 10 feet by 50 feet, if all goes well with the permitting.
The dredging company came by this afternoon and hauled away the fuel container that was stored near the boat ramp.