Friday, July 09, 2010

The high tide this week was even higher than the one last week.
This area floods because the water comes up from the mitigation site through the drain pipe at the boat wash area.
The boat ramp above is completely flooded and the water is over the crossbridge.
The finger piers were submerged again and this time some boards came off and floated away.
Water flowed across the road and joined the HEB pond.
The old pier got another pounding and even more boards washed away.

0 Comments:

Post a Comment

<< Home