Monday, June 06, 2011

Long Nguyen finished up the spillway work today. The concrete truck downloaded the mix into the bucket of the bobcat and then the bobcat transported it to the site.
The concrete was dumped into the work area and spread.
The final result looks about like this although the final touches were put in today.
The bulkhead repair work was done behind the 100 building.