On Tuesday evening I noticed the lights were out on the 300 and 400 buildings. I found a breaker that had been tripped and reset it. The lights came on the 300 building, but not the 400. Larry Rabe trenched up the wiring that runs from the corner of 308 around the parking lot curb and back to 401. The break in the wire was just east of the sidewalk. There was no apparent reason for the wire to short and burn entirely in two, but it did. Larry spliced it together and sealed the connection and reburied the line. This probably saved us some big bucks that an electrical company would have charged to locate and repair the line.
Sunday, October 16, 2011
Previous Posts
- Tom Durfee dug this trench for the electrical cond...
- I have to guess the reds stayed around all evening...
- Ralph(101)shows that the fish are still in the mit...
- After seeing no reds caught in the mitigation site...
- Work began today on the repair of the lights on th...
- No keeper reds were caught in the mitigation site ...
- The reds are still in the mitigation site, but tod...
- Joe and Bev Fischer came in yesterday and found th...
- Work on the new causeway is moving slowly. With th...
- Larry Skelton continues work on the deck railing p...
0 Comments:
Post a Comment
<< Home