Wednesday, October 19, 2011

This is the new control panel installed to accommodate the power for the pier lighting.
AEP came out about 8:30 to turn off the power to 101 through 104 while the new panel was installed. They returned about 4pm to turn the power back on. I'm not sure why it would take two big trucks to connect a few wires in the cluster behind 708.

0 Comments:

Post a Comment

<< Home