Saturday, April 26, 2014


 Rebar was being added here to the bulkhead repair. The concrete should be poured next week.
 While concrete work is being done, the sidewalk between 308 and the cabana will be repaired. This sidewalk step has been broken for a very long time.
 An inspector was here on Wednesday to check out condo 106 before the sale closes.
The crossbridge gate has been completed except for the combination lock. Notice the five large stainless steel hinges that were used. This gate is very heavy duty.