Monday, October 20, 2014


 A Time Warner contractor came out today to replace the cable that was compromised last week.
 The first problem they ran into, besides the rain, was that the water table is so high that when they dug down only about two feet, the hole began to fill with water. That can be seen on the right side of the picture above.
 They dug down here at the corner and then used the pneumatic mole to tunnel down the edge of the driveway.
Then they turned the mole to the right to tunnel under the road to the area near the mailboxes.