Tuesday, October 14, 2014


 Yesterday we had two trucks from Time Warner come out. They strung cable wire from palm tree to palm tree as a temporary repair until then can bury the wire.
 They joined the new wire into the existing wiring at the sidewalk that leads to the crossbridge after stringing it from in front of the 700 building.
The culprit, it turns out, was the bollard in the concrete in the middle of the picture. When a hole was drilled for it by D&C Fence Company, they hit the under ground wire a few weeks ago. It took this long for the wire to completely fail.

0 Comments:

Post a Comment

<< Home