PROPERTY MANAGER'S REPORT
MAY 2007- SEPTEMBER 2007
Buildings / Decks
Repair / Replacement of the following front lower decks:
101-102, 103-104, 209-210, 501-502, 503-504, 505-506,
507-508, 601-602, 603-604, 605-606, 607-608, 105-106,
107-108, 201-202, 301-302, 303-304, 305-306, 307-308.
Repair / Replacement of following rear lower decks 108 upper and lower, 103, 104, 105,
106
Lowered A/C stands on 102, 107, 202, 206, 303, 308, 401, 704, 705
Repairs to stucco around new decks completed by Coastal Bend Painting
Replaced screens as needed by Eddie Nava
Removed damaged stucco around electrical meters on the 700 building. Repaired all
dryrot and termite damage. Rebuilt meter enclosure and installed new stucco.
Painted beach skirting on 100, 200, 300 buildings to match natural wood color.
Roof repairs completed by River City Roofing on 501 and 705
Repairs and adjustments to electrical panel doors on multiple buildings
Hydrojetted main sewer lines to clear grease build up and debris.
Ran sewer camera through drain lines to check for damage to lines completed by Tite
Lines Plumbing.
Installed clean outs near lift station.
Collected bids for exterior painting.
Collected bids for pressure washing of buildings, handrails, decks and touch up paint of
all buildings. Had small portion of 600 building pressure washed to see results.
Breakwater / Docks
Inspected and refastened loose deck boards on pier and board walk
Repaired boat slip platform behind 500 building completed by Jack Gibbs Co.
Collected bids on replacing boat slips with new wood platforms
Multiple pilings, stringers and deck boards repaired / replaced by Jack Gibbs Co.
Repaired damage to end of pier (Replaced deck boards and handrails)
Replaced multiple halogen bulbs on pier
Grounds / Landscaping / Out Building
Replaced outdoor shower valve
Checked property for damage to sprinkler system
Removed fourth dumpster near maintenance shed
Removed dead plants from 100 building and installed weed block with river rock in
flower beds
Installed multiple plants in front of 100 building
Had all palm trees trimmed by CMT Services
Had pool handrail repaired by AA Pool Service
Collected bids for new landscape contract
Had Garrett Construction patch pot holes on main drive
Repaired pot holes through out parking lot using approximately 50 bags of asphalt
Pool furniture repaired multiple times using stainless hardware
Installed new hose hanger in pool area
Lift Station
Multiple repairs made by Peeco
Removed and cleaned floats completed by Peeco
On going maintenance and minor repairs to lift station
Replaced capacitor and wire connectors
Partial List of Ongoing Projects
Repairs / replacement of decks
Replacement of bulbs and light fixtures as needed throughout property
Obtaining bids to detach end of pier and rebuild L-Head larger and raised
Install drains on beach bulk head near 100 building to allow better drainage and stop sand
Erosion
Repair to parking lot including pot hole repair and restriping.
Received bid from Sand Dollar Security for Phase I property.
Repairs / replacement of damaged posts under buildings.
Ongoing Maintenance for Phase I
Property is inspected and maintained daily, including but not limited to picking garbage and debris in parking lot and surrounding areas, emptying garbage cans, watering areas not covered by sprinkler system, inspecting boat ramp. Straighten and properly place pool furniture. Inspect barbeque pits and clean as needed. Clean and straighten furniture under canopies at end of 300 building. Inspect and clean fish cleaning table as needed. Skim pool.
May 2007 - $765.00
June 2007 - $765.00
July 2007-$765.00
August 2007 - $765.00
September 2007 - $765.00