- Replaced porch and gazebo lights that were out with LED bulbs

- Sprayed weed kill on side and front of 700 building

- Replaced pool bulbs that were reported out

- Sprayed mildew cleaner on the back of 701, 702, 600 and 508 lower deck areas

- Painted the side of buildings of 501, 210, 201, 108, 701 of orange discoloration

- Repaired a water hose faucet behind 401

- Painted areas on the building that had stucco patch visible

- Trimmed the bushes in front of the 700 building

- Followed up on the cart repair from the Cart store - Total repair cost was $240.32 - They had replaced a bent spring (which was the reason we could not get it to move), bent snap ring, and clutch belt as the other one had a cracked area in it. Now because the new belt in place is causing the starter to finally go out.  Interstate battery can refurbish the start - just need to take it off.

- Monitored the pouring of concrete under the 200 building

- Monitored the break water project - only has about 25 ft left to remove.  Randy's crew removed an extra 50 feet on each side and will submit an invoice for the extra footage

- Finish the touch up paint on the office building

- Spoke with OSHA regarding compliance - everything is good - just need to purchase the eye wash online and forward a receipt - no stores sell them and has to be ordered - Northern tools only rents the eye was per day.  OSHA had emailed me some information to provide for Hazard Communication Training for the employees to go over with.

- Trim palm trees in front of the 700 building along the driveway

- Assist with pest control to spray in units of 303, 601, and under 203

- Spoke with Allen of the insurance compliance schedule asap - he said that he has another that has looked it and is trying to get it started by this week

- Spoke with 708 regarding her sliding glass door being broken.  They went through their insurance company and have ordered their new sliding door.

- Monitored the new french door being installed on the back entrance of 303

This weeks agenda
- Allen will be draining the pool and start working on the compliance - estimated finish time is by this Sunday
- Plant some flowers under the entrance sign
- Cut more palm trees along the driveway and near pool area
- Trim the hedges on the back of 700 and front of 500, 300, and side of 400 building
- Paint skirting areas that have orange discoloration
- Pressure wash upper lower deck areas of 600 building