Lina's weekly notes
- Replaced porch and gazebo lights that were out with LED bulbs
- Replaced porch and gazebo lights that were out with LED bulbs
- Sprayed weed kill on side and front of 700 building
- Replaced pool bulbs that were reported out
- Sprayed mildew cleaner on the back of 701, 702, 600 and 508 lower deck areas
- Painted the side of buildings of 501, 210, 201, 108, 701 of orange discoloration
- Repaired a water hose faucet behind 401
- Painted areas on the building that had stucco patch visible
- Trimmed the bushes in front of the 700 building
- Followed up on the cart repair from the Cart store - Total repair cost was $240.32 - They had replaced a bent spring (which was the reason we could not get it to move), bent snap ring, and clutch belt as the other one had a cracked area in it. Now because the new belt in place is causing the starter to finally go out. Interstate battery can refurbish the start - just need to take it off.
- Monitored the pouring of concrete under the 200 building
- Monitored the break water project - only has about 25 ft left to remove. Randy's crew removed an extra 50 feet on each side and will submit an invoice for the extra footage
- Finish the touch up paint on the office building
- Spoke with OSHA regarding compliance - everything is good - just need to purchase the eye wash online and forward a receipt - no stores sell them and has to be ordered - Northern tools only rents the eye was per day. OSHA had emailed me some information to provide for Hazard Communication Training for the employees to go over with.
- Trim palm trees in front of the 700 building along the driveway
- Assist with pest control to spray in units of 303, 601, and under 203
- Spoke with Allen of the insurance compliance schedule asap - he said that he has another that has looked it and is trying to get it started by this week
- Spoke with 708 regarding her sliding glass door being broken. They went through their insurance company and have ordered their new sliding door.
- Monitored the new french door being installed on the back entrance of 303
This weeks agenda
- Allen will be draining the pool and start working on the compliance - estimated finish time is by this Sunday
- Plant some flowers under the entrance sign
- Cut more palm trees along the driveway and near pool area
- Trim the hedges on the back of 700 and front of 500, 300, and side of 400 building
- Paint skirting areas that have orange discoloration
- Pressure wash upper lower deck areas of 600 building