Work around here continues at a hectic pace. The roof project has been pushed back until Sunday. They didn't want to disturb the many guests this weekend. The roofer plans to finish the 100,200, and 300 buildings next week. Then they will take a break for Memorial Day and finish the rest. Painting will begin as soon as the roof project is completed. Some tint of yellow is being considered. The picture is of the end of the 100 building with three colors that are being considered. The sidewalk repair at the corner of 608 was completed today.
Friday, May 16, 2008
Previous Posts
- This weekend is the "Babes on the Bay" weekend. T...
- Randy(308) sent this interesting article from the ...
- It looks as if things are going to be very busy ar...
- Chuck(107) sent these pictures of their condo on ...
- Tuesday the winds gave us a break. I put two poles...
- From the Rockport PilotOyster bed restoration targ...
- The Nautical Flea Market was held this weekend at ...
- After talking to several people about my big fish ...
- We finally got a break from the wind on Tuesday. ...
- Here is Randy's(308) report on the weekend weather...
0 Comments:
Post a Comment
<< Home